Forum Index
HomeZBasic Home   Forum RulesForum Rules   Forum FAQForum FAQ   MemberlistMemberlist   UsergroupsUsergroups   RSS FeedRSS Feed
Site SearchSite Search   LinksLinks   DownloadDownload   Digests and SubscriptionsDigests and Subscriptions
ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in   RegisterRegister
Could be possible to use the ADC in free running mode?
Goto page Previous  1, 2, 3, 4
 
Post new topic   Reply to topic    Forum Index -> ZBasic Language
Author Message
sturgessb



Joined: 25 Apr 2008
Posts: 246
Location: Norwich, UK

Posted: 30 June 2008, 10:09 AM    Post subject: Reply with quote

For those of you that were interested, here is a short video demo of the ZX copter

http://www.ustream.tv/recorded/509806

This is as it stood a few days ago. Since then I have implemented a sonar minimum height and height hold (works up to 5m), compass for heading hold, and improved pitch / roll stability.

Some stats:
Main processor ZX-128ne (used for main sensor collection and flight code)
Support processor ZX-24n (used for PPM decoding and low priority sensors)

Main control loop is running at 450hz (gyros, angle estimation, flight calculations, motor control)
Second loop is running at 100hz (accelerometer data)
Third loop running as 40hz (Compass, RC input, link to ZX-24)
Fouth loop running at 20hz (Sonar, barometric)
Fifth loop running at 5hz (Serial Downlink)

Ill keep you posted how it goes.

Ben
Back to top
mikep



Joined: 24 Sep 2005
Posts: 771
Location: Austin, TX

Posted: 30 June 2008, 15:13 PM    Post subject: Reply with quote

Very cool video Ben.

Getting the PID constants and implementation correct is probably the hardest bit. Always good to put a face to the name as well Smile
Back to top
liam.zbasic



Joined: 25 Mar 2008
Posts: 163
Location: Southern California (Blue)

Posted: 02 July 2008, 4:17 AM    Post subject: Reply with quote

Excellent work. I'm also amazed that you are able to conduct your flight tests in the same place you cook, do dishes, do laundry and make videos. May I ask how much this project has cost you in materials (not time)? Thank you.

Regards,
P.
Back to top
sturgessb



Joined: 25 Apr 2008
Posts: 246
Location: Norwich, UK

Posted: 04 July 2008, 10:00 AM    Post subject: Reply with quote

not much choice with the testing environment, are waiting to complete on a new property, which will mean proper workshop etc. Until then, its the kitchen!

To date I have spent around $3000 on the electronics side of things, although obviously a lot of that was for parts that turned out to be not quite right.

It's certainly not a cheap thing to try.

B
Back to top
Display posts from previous:   
Post new topic   Reply to topic    Forum Index -> ZBasic Language Time synchro. with the server - Timezone/DST with your computer
Goto page Previous  1, 2, 3, 4
Page 4 of 4

 


All content Copyright © 2005-2012 Elba Corp. All Rights Reserved.
Opinions expressed in posts are those of the author and not necessarily those of Elba Corp.
Powered by phpBB © 2001, 2005 phpBB Group